The Track Hoe is parked on the autocourt. The grade is fairly close to the final level of the Auto Court. The next step here will be to build the retaining wall on the front side. The machine has just removed a large pile of dirt in this location.
A view from the Auto Court looking at the connector and towards the front of the house.
Standing in the Auto Court looking back towards the connector and garage.
A view looking down the foundation wall at the back of the house.
Back side of the garage.
Standing on the mound in the backyard looking at the footprint of the house. The garage is in foreground.
Looking down on the footprint of the garage.
An nice gradual driveway slope up to the Auto Court.